APD Development Feasibility
Auto-saved / 已保存

How to Use This Calculator / 如何使用本测算器

Start with the six numbered sections and read the five key results at the top. / 按顺序填写六个编号区域,再查看页面顶部五项核心结果。

All numeric fields start at zero and are saved automatically in this browser. Enter project, tax and finance assumptions before relying on the results. / 所有数字字段初始为零,并会自动保存在当前浏览器中。使用结果前,请填写项目、税务及融资假设。

  1. 1
    Define the project / 定义项目Enter the location, project type and estimated programme. / 填写州、项目类型和预计开发周期。
  2. 2
    Enter land and development costs / 填写土地及开发成本Enter the land price, GFA, construction rate, civil works and authority costs. / 填写土地价格、总建筑面积、建造单价、土木工程及主管部门费用。
  3. 3
    Estimate revenue / 估算项目收入Enter the number of saleable units, average sale price and any other revenue. / 填写可售单元数、平均每单元售价及其他收入。
  4. 4
    Set finance and selling assumptions / 设置融资及销售费用Enter LTC, Loan to GRV, interest rate, loan fee and selling costs. / 填写 LTC、贷款占 GRV 比例、利率、贷款费用及销售费用。
  5. 5
    Review results and downside risk / 查看结果及下行情景Compare Profit on Cost with your target, then review the sensitivity tables. / 将成本利润率与目标回报比较,再查看敏感性分析。
How to Read the Main Results / 如何理解核心结果
GRV
Gross Realisation Value: total expected value from sales and other revenue. / 总实现价值:预计销售及其他收入的合计。
TDC
Total Development Cost: acquisition, development, selling, GST and finance costs. / 总开发成本:收购、开发、销售、GST 及融资成本合计。
Development Profit / 开发利润
GRV minus TDC. / 总实现价值减去总开发成本。
Profit on Cost / 成本利润率
Development Profit divided by TDC; commonly used to assess development returns. / 开发利润除以总开发成本,是常用的开发回报指标。
Residual Land Value / 土地剩余价值
Maximum land price supported while achieving the selected target return. / 在达到所选目标回报率时,项目可支持的最高土地购买价。
Finance Settings / 融资设置

LTC is the loan as a percentage of eligible project cost. Loan to GRV is the loan as a percentage of GRV. The calculator uses the lower of these two facility limits. / LTC 是贷款金额占可融资项目成本的比例;贷款占 GRV 比例 是贷款金额占总实现价值的比例。测算器采用两项贷款上限中较低的一项。

Equity Required is TDC less the calculated loan amount. Interest is estimated from the project timing and staged debt drawdown. / 所需自有资金为总开发成本减去测算贷款金额;利息根据项目周期及分阶段提款进行估算。

GST and Transfer Duty / GST 与土地转让税

Sale prices are entered GST-inclusive. For an initial screening, keep the default GST setting only when it matches your expected tax treatment. / 销售价格按含 GST 金额填写。只有当默认 GST 设置符合项目预计税务处理时,才可在初筛中保留默认值。

Automatic Transfer Duty currently uses QLD general rates only. For other states or complex acquisitions, enter an estimated rate or a confirmed manual amount. / 土地转让税自动计算目前仅采用昆士兰州一般税率。其他州或复杂收购应输入估算费率或经确认的手动金额。

Decision Guide / 初步判断方法
Target Met / 达到目标The selected return meets or exceeds the target. / 所选回报指标达到或超过目标。
Below Target / 未达到目标The project is profitable but below the selected target. / 项目仍有利润,但未达到所选目标。
Not Feasible / 不可行The current assumptions produce a development loss. / 当前假设下项目产生开发亏损。
Important / 重要提示

This is a screening model, not tax, legal, quantity surveying or lending advice. Confirm material assumptions with qualified advisers before making an acquisition decision. / 本工具仅用于项目初筛,不构成税务、法律、工料测量或融资建议。作出土地收购决定前,请由专业顾问复核重要假设。

Australian Property Development Feasibility Calculator

Quickly test land acquisition, development costs, revenue and project profitability. / 快速测算土地收购、开发成本、项目收入及盈利能力。

- -
Feasibility Assessment / 可行性判断 -

-

GRV / 总实现价值 - Gross Realisation Value
Total Development Cost / 总开发成本 - TDC
Development Profit / 开发利润 - -
Profit on Cost / 成本利润率 - Profit ÷ TDC
Residual Land Value / 土地剩余价值 - -
Profit Margin / 销售利润率-
Equity Required / 所需自有资金--
Finance Cost / 融资成本--
Project Duration / 项目周期--

Project Assumptions / 项目测算参数

All figures update instantly / 所有测算结果实时更新

01

Project / 项目

Project Duration / 总项目周期-
02

Site & Acquisition / 地块与收购

Transfer Duty / 土地转让税(印花税) - Total Acquisition Cost / 总收购成本 -
03

Development Costs / 开发成本

Construction Cost / 建造成本-
Average GFA / 单元平均 GFA - GFA : Site Area / 建筑面积与土地面积比 -
04

Revenue / 项目收入

Saleable Units / 可售单元数-
GRV / 总实现价值-
05

Finance / 融资

Debt / 贷款金额-
Equity / 所需自有资金-
Finance Cost / 融资成本-
Funding Constraint / 融资限制条件-
06

Selling Costs / 销售费用

Total Selling Cost / 总销售费用-

Downside & Upside Testing / 下行与上行情景分析

Profit shown for each scenario / 表格显示各情景开发利润

Sale Price vs Construction Cost / 售价与建造成本

±5% · ±10%

Land Price / 土地价格

±5% · ±10%

Model Settings / 模型设置

Review these assumptions before relying on results / 使用结果前请复核以下假设

Transfer Duty / 土地转让税(印花税)
Consultants & Other Costs / 顾问及其他成本
GST Treatment / GST 处理
Output GST / 销项 GST - Input GST Credits / 进项抵扣 - Net GST Cost / 净 GST 成本 -